Deck Builders Melbourne, Eastern Suburbs | Terraza Group
10+ years experience $20M Public Liability ABN 39 104 568 456 Mon–Sat 7:00–17:00 · 0433 697 125
Request a quote
Terraza CarpentryDecks, steps & timberA Terraza Group business ↗

Home / Construction / Decks

Timber deck builders, Melbourne

Merbau, spotted gum and composite decks, ramps, steps, gates and fences, built on level, well-fixed subframes that don't bounce, rot or move. Based in Notting Hill, next to Glen Waverley, building across Melbourne's eastern suburbs.

Merbau & hardwoodComposite deckingRamps, steps & gates
Finished merbau timber deck with step along a brick home in Melbourne
Merbau deck · September 2025

How we build a deck

It's all in the subframe

A deck is only as good as what's under the boards. Every Terraza deck starts with set-out, footings and a level, braced subframe, then boards fixed with even gaps.

Treated pine deck subframe set out and levelled in a backyard
Set-out & subframe
Deck bearers and joists, then finished merbau boards
Framing to boards
Long merbau deck running along a side yard
Finished side-yard deck
Timber deck with ramp along a side access, before and after
Deck & ramp

Choosing your decking

MaterialLookCarePrice
MerbauRich red-brown hardwoodOil yearlyQuote on request
Spotted gumAustralian hardwood, varied grainOil yearlyQuote on request
CompositeConsistent colourWash onlyQuote on request
Treated pineBudget, paints or stains wellStain regularlyQuote on request

Decks, steps, ramps and more carpentry

We also build steps, access ramps, pergola bases, timber gates, picket fences and screens, and repair fascias and rotten timber. It's all carried out by the same team that does your paving and landscaping.

New timber picket gate built and painted beside a carport
Timber gate & fence

Do I need a permit for a deck?

Low decks close to the ground often don't, but higher decks, decks attached to the house and decks near boundaries or pools may need a building permit. We check your design against Victorian requirements before we start and arrange a building surveyor if one is needed.

Questions

Decking FAQ

How long does a deck take to build?

A typical backyard deck of 15–30 m² takes around 1 week, weather permitting.

Merbau or composite?

Merbau is warmer and cheaper up front but needs oiling. Composite costs more but only needs washing. We bring samples to your site.

Can you replace old boards on my existing deck?

Often, yes, if the subframe is sound. We check it first; if the frame is failing, we'll tell you honestly.

Do you build ramps for accessibility?

Yes. We build timber ramps with handrails and non-slip finishes for side access, bins and mobility.

Start your deck

Tell us about your deck

  • 24 hA call back within one business day.
  • VisitWe measure and check levels and footings.
  • 48 hA written, fixed-price quote.

Deck quote

No obligation.