House demolition for knock-down rebuilds, Melbourne

Pulling down an old house to build a new one? We organise the demolition with a registered demolisher, then our crew takes out the slab, footings, driveway and rock and does the site cut. Your builder gets a clean, level block.

Knock-down rebuildsSlab & footings outRock breakingSite cut to levels

Request a quote

Address or plans · fixed-price quote

Rather talk? Call John on 0433 697 125

On site

How a demo job goes

Recent Terraza demolition and clearing work.

Mini excavator rock breaker demolishing a concrete slab
Rock breaking a slab
Broken concrete ready for removal
Ready for removal
Demolished stone loaded into a tipper
Spoil removal
Old pool paving being removed
Pool surround demolition

House demolition in Melbourne

Most of the houses we deal with are coming down for a knock-down rebuild, a pair of townhouses or a small unit development. The hard part is rarely the demolition itself. It's the order of jobs before it, and the slab, rock and site cut after it.

That's where we help. We line up the permit, the asbestos removal, the service disconnections and a registered demolisher, then our own crew handles everything at ground level: concrete, footings, rock breaking, the site cut and drainage.

What a house demolition involves

  1. Asbestos check. If the house was built before 1990, a licensed removalist checks it and takes out any asbestos first.
  2. Services off. Gas, power and water are abolished by the providers and a licensed plumber caps the sewer.
  3. Permit. A building surveyor issues the demolition permit. Heritage areas may also need council approval.
  4. Knock-down. A registered demolisher brings the house down and the material is sorted for recycling.
  5. Slab and footings out. Our crew removes the slab, footings, driveway, paths and stumps, and breaks any rock.
  6. Site cut. We cut and level the block to your builder's plans and leave it ready for the slab.

Permits and the rules in Victoria

Demolishing a house in Victoria needs a building permit, and the work must be done by a registered demolisher. If your street is under a heritage overlay, council may also need to approve it. Before any machine starts we locate underground services through Before You Dig Australia and plan where trucks will park.

One team from demolition to site cut

Because the same company runs the concrete removal, excavation and site cut, drainage and retaining walls, there's no waiting between trades. For smaller jobs such as sheds, slabs and pool surrounds, see our main demolition page.

What sets the price

Every quote is fixed-price and itemised after we look at the site. These are the things that move it:

FactorWhy it matters
House size and materialsBrick takes longer and costs more to cart than weatherboard
AsbestosRemoval and clearance before demolition starts
Access and streetNarrow streets, tram lines and parking for trucks
Slab, footings and drivewayThickness, steel and how much concrete comes out
Trees, stumps and rockRock breaking and stump grinding add machine time
Site cutVolume of soil to dig and take away

Questions

House demolition FAQ

Do I need a permit to demolish my house?

Yes. In Victoria, demolishing a house needs a building permit from a building surveyor. If the house is under a heritage overlay, council may also need to give a planning permit. We tell you what your site needs before you pay for anything.

What happens if the house has asbestos?

Houses built before 1990 often have some. A licensed asbestos removalist takes it out first and gives a clearance certificate, then the demolition can start.

Who disconnects the gas, power and water?

Your energy and water companies abolish the services, and a licensed plumber caps the sewer. We give you the list early because these can take weeks to book.

How long does a house demolition take?

The knock-down itself is often only a few days. The permit, asbestos removal and service disconnections usually take longer, so it pays to start them early.

Can you do the site cut as well?

Yes. After the house comes down we remove the slab, footings, driveway and stumps, break any rock and cut the site to your builder's levels.

Do you work for builders and developers?

Yes. We price demolition and site preparation as one package from your plans and work under your site rules.